Compilation of photos from field work in San Diego Lagoons, San Diego, Del Mar, and Carlsbad, winters 2014-2016.
-
-
Maddie and Kent prepping for Agua Hedionda Lagoon deployment, February 2016
-
-
Agua Hedionda instruments after recovery, April 2016
-
-
Guza team deploying Los Pen pressure sensors, December 2014
-
-
Los Pen mouth closure, April 2015
-
-
Los Pen mouth opening, April 2015
-
-
Los Pen mouth opening, April 2015
-
-
Angelica and Maddie setting up the frame to redeploy instruments in Los Pen, August 2015
-
-
Isa and Maddie setting up the frame to redeploy instruments in Los Pen, November 2015
-
-
Maddie does bathymetry/topography surveys at Los Pen, January 2016
-
-
Isa does bathymetry/topography surveys at Los Pen, January 2016
-
-
Los Penasquitos Lagoon pressure sensor marker pole
-
-
Los Penasquitos Lagoon mooring recovered after 2 month deployment
-
-
Los Penasquitos Lagoon bathymetry/topography survey January 2016
-
-
that is the handrail!!!
-
-
Los Pen blocked by huge cobble berm, March 2016
-
-
Los Penasquitos mouth breaching March 2016
-
-
Torrey Pines infrastructure damage April 2016
-
-
Torrey Pines infrastructure damage April 2016
-
-
San Dieguito Lagoon deployment January 2016
-
-
San Dieguito Lagoon deployment