Compilation of photos from field work in San Diego Lagoons, San Diego, Del Mar, and Carlsbad, winters 2014-2016.
- Maddie and Kent prepping for Agua Hedionda Lagoon deployment, February 2016
- Agua Hedionda instruments after recovery, April 2016
- Guza team deploying Los Pen pressure sensors, December 2014
- Los Pen mouth closure, April 2015
- Los Pen mouth opening, April 2015
- Los Pen mouth opening, April 2015
- Angelica and Maddie setting up the frame to redeploy instruments in Los Pen, August 2015
- Isa and Maddie setting up the frame to redeploy instruments in Los Pen, November 2015
- Maddie does bathymetry/topography surveys at Los Pen, January 2016
- Isa does bathymetry/topography surveys at Los Pen, January 2016
- Los Penasquitos Lagoon pressure sensor marker pole
- Los Penasquitos Lagoon mooring recovered after 2 month deployment
- Los Penasquitos Lagoon bathymetry/topography survey January 2016
- that is the handrail!!!
- Los Pen blocked by huge cobble berm, March 2016
- Los Penasquitos mouth breaching March 2016
- Torrey Pines infrastructure damage April 2016
- Torrey Pines infrastructure damage April 2016
- San Dieguito Lagoon deployment January 2016
- San Dieguito Lagoon deployment